Monday, January 19, 2015

Exterior facade cladding is made at the outer perimeter of the structure of the system of vertical


Fashion Arena Outlet Center in Prague is a multipurpose marks spencer business center, whose first phase was opened on November 15, 2007. The Center has 17.500 m2 of retail space, on which is located approximately 70 sales units, 1,200 parking spaces and 9 restaurants and cafes. Currently preparing the construction of the second phase of the shopping center.
Looking at the first notch first phase of this business giant. Fashion Arena Outlet Center is based on projects of American business centers where manufacturers marks spencer and retailers sell quality branded goods such as. Men's and women's clothing, shoes, accessories, sportswear, children's clothes and utensils with up to 60% discount directly to customers. Shops are located in the Oval block inside which an internal courtyard used for the proposed parking on two levels. In the corner of the block superstructure are located restaurants and offices. Entry to the shops inside the complex, while supply is designed from the external marks spencer circuit. Hardware is located in the basement below the smaller shops and partly on the roof. CONSTRUCTION DESCRIPTION Substructure Substructure has a relatively small range. Used for positioning technology hardware (end connections, marks spencer heat transfer stations, sprinklers). It is made of reinforced concrete. The reinforced concrete structure is made up of a base plate, perimeter walls, interior marks spencer columns and ceiling. The outer structure walls, ceiling and base plate are made of concrete water retaining conc.
Supporting marks spencer structure superstructure superstructure consists of precast reinforced concrete frame, columns are mounted on piles into the cup, ceiling structure consists of the joist trusses in the roof slope, which is laid supporting the sheet. The ceiling of the two-storey incl. walkable part of the outdoor terrace is made of filigree zmonolitněných plates with a total thickness. 160 mm. Ply part of the ceiling below the terrace is roofed with corrugated galvanized steel roof structure. The construction of the car park is designed prefabricated scaffold, precast reinforced concrete ceiling is made of prestressed panels Spiroll with monolithic settlement.
Roof sheathing is stored on precast reinforced composite skeleton of girders and purlins at a gradient of 5.8%. Roofing assembly is placed on the sheet. The roof is designed as a thermal insulation according to CSN 73 0540, with a waterproofing membrane on the upper surface. This is an unaired song, so is the trapezoidal sheet laid vapor PE foil and carefully to prevent leakage between all downstream structures. Following thermal insulating layers, which meets the required fire resistance of the roof structure 15 minutes. The song is closed welded mPVC Waterproofing foil separation fabric. The film is pulled marks spencer under by the parapet capping façade panels and clamped marks spencer under pressure plate. The breadth of one meter from the frieze is created by inserting wedges catchment insulation protispád, which is formed by a trough with roof gullies. Roof drains are provided with a covering basket, the film is welded to the collar marks spencer system.
Track mPVC film thickness. 1.2 mm (waterproofing) fabric 120 g / m 2 (separation layer) EPS 70S plate thickness. 80 + 40 mm (insulation) mineral board STEPROCK 2 20 mm (thermal insulation and fire) PE foil 0.2 mm (vapor barrier) trapezoidal plate 135 / 0.7 mm structure gradient in 5.8%
Exterior facade cladding is made at the outer perimeter of the structure of the system of vertical facade panels Trimoterm FTV Standard 150 mm with micro profile. Sandwich panels are anchored to the floor through the mounting plate, attics are anchored to the perimeter purlins. Panels curved parts of the building are placed polygonal and at the kink are shaped by unilateral pruning of the interior. On the facade randomly alternating dark (RAL 7011) and light panels (RAL 9006). Exterior steel doors wide 1.900 mm and 2.350 mm high with a steel frame fitted to a steel sub-frame Jákl 100/100/4, which serves as a replacement for anchoring facade panels. marks spencer The doors are solid, insulated with safety fittings, RAL 7011th marks spencer Businesses are no windows, only a guard room equipped with fixed aluminum window double glazing, frame and sash shade RAL 9006 ext / int RAL 9003rd
The inner facade is formed marks spencer almost in its entirety glazed window displays. The interior is designed façade marks spencer system Wicona WICTEC 50HI of aluminum profiles with insulating double glazing, in the shade RAL 9007 ext / int RAL 9003. The entrance double door to the business units are designed in the system Wicona WICSTYLE 70E RAL 9007. The doors are double marks spencer glazing , stainless steel handrail and are equipped marks spencer with self-closing. The facade between window and awning is complemented marks spencer horizontal sandwich panel Trimoterm tl. 150 mm with a smooth surface. The facade above the awning is on the upper part of the building complemented by standard marks spencer panels Trimoterm FTV Standard 150 mm with Micro-RAL 9006. The lower part of the building have a transition between the roof and the roof awning, which is not

No comments:

Post a Comment